
Azzuro Resources PLC (“Azzuro” or the “Company”) (ASX: AZ9) is pleased to announce maiden JORC (2012) Exploration Target estimates at both its 100%-owned Oval Cu-Ni-PGE and the Red Hill (Maikhan Uul) Cu-Au-VMS projects, the Company’s two flagship assets located in southwest Mongolia. HIGHLIGHTS: Maiden JORC (2012) Exploration Targets estimated at the Oval Cu-Ni-PGE and Red Hill CuAu-VMS projects — just 8km apart within a single exploration corridor — underlining the district-scale, multi-commodity potential of the Company's southwest Mongolia portfolio. The project proximity supports the potential for shared infrastructure, camp facilities, permitting efficiencies and a unified development pathway as both projects mature. A combined 14 hole ~5,835m priority drilling program has been designed to test the highest-priority Exploration Target bodies at both projects. A separate, lower-cost pathway of 3 holes (290m) at Oval and 11 holes (1,760m) at Red Hill could convert a portion of both targets to JORC (2012) Inferred Mineral Resource status. Drilling is imminent and geophysical studies (DHEM and 3DIP) are commenced Azzuro’s Managing Director, Gan-Ochir Zunduisuren, commented: "These maiden Exploration Targets confirm exactly what we've long believed — Oval and Red Hill aren't two isolated discoveries, they're one fertile mineralised corridor. That's genuine district-scale exposure to copper, nickel, gold and PGEs in one of the world's most under-explored, strategically located
Seguir leyendo


